Saturday, February 7, 2015

February update

Time to work, removed blackwater tank and cleaned up (Messy job but its done)




starting on floor removal


insulation of door, found my door was broken so did a little patch and repair















Installed outside light this is a new light with a 18 led bulb, VTS base, Amazon LED bulb




Finished install on fan



Saturday, November 22, 2014

 insulation work
 Water inlet hole repair
 new LED running lights



Thursday, December 5, 2013

Rock Guard Repair

 installed a nice set of rock-guard latches found at http://gatelatchusa.com/hook_and_eye_latches.html. Used a Stainless Steel Eye Bolt found at the same site. I looked around and found these the best corrosion resistant latches that maintain a vintage look. quality is great. I would highly recommend this site for fastener needs.


#104843-2" Solid Brass Safety Hook & Eyes
#828515-3/16" x 1-1/2" Stainless Steel Eye Bolts


Sunday, November 24, 2013

deconstruction continued and glass work

After a few weeks of not being able to work on the cans i got some time in Sunday. finished removal to bulkhead and placed my front glass

thanks to http://elitecustomglass.com/ for the glass work, these guys are awesome, custom safety glass with excellent shipping

glass bedding and glazing strips from VTS new window activators as well,

 glass is the bronze colored safety glass
Description of glass repair procedure


gaucho going out the door, floor front is on excellent shape, some rot on rear cap seam on both sides
so as normal no getting out of floor work.





Friday, November 1, 2013

deconstruction and dog in a box








 floor rot ugh!
 repaired and rebuilt hitch lock
yes its a dog in a box, day 1719
 Dog in a box, day 1

Friday, October 11, 2013